CONSTRUCTION INSPECTOR’S CHECKLIST FOR STORM …
Web Jan 1, 2012 When trench backfill is used the lifts shall not exceed 8 inches (200mm) in depth, loose measurements, and each lift shall be compacted to 85 percent of standard …
From idot.illinois.gov
File Size 228KB
Page Count 8


TYPICAL TRENCH DETAIL - ILLINOIS
Web idot gradation ca-11 and cover material granular pipe bedding or plan sheets proposed pipeline * 0.d.x1 1/3 20" to 24" = 42" 33" and longer = 27" to 30" = 48" ... limits of special …
From apps.dot.illinois.gov
File Size 191KB
Page Count 1


FY2020 DOCUMENTATION GUIDE - ILLINOIS DEPARTMENT OF …
Web FY2020 Documentation Guide - Illinois Department of Transportation
From idot.illinois.gov
File Size 7MB
Page Count 186


GRANULAR MATERIALS (BDE) FINE AGGREGATE FOR BEDDING, TRENCH …
Web Backfill, Sand Backfill for Underdrains, and French Drains.” Revise Article 1003.04(c) of the Standard Specifications to read: “(c) Gradation. The fine aggregate gradations for …
From idot.illinois.gov


DESIGNER INFO - IOWA DEPARTMENT OF TRANSPORTATION
Web minimum trench dimension. Actual slope of trench may Quantity calculations are based upon a 1:1 slope and when used for bedding. Extend Porous Backfill through the outlet …
From iowadot.gov


SECTION 3010 - TRENCH EXCAVATION & BACKFILL - IOWA DEPARTMENT OF ...
Web of Unsuitable Backfill Material: 1. in cubic yards for the quantity of backfill material required to replace unsuitable backfill material removed during standard trench excavation. …
From iowadot.gov


FIGURE 3010.101 - TRENCH BEDDING AND BACKFILL ZONES
Web TRENCH BEDDING AND BACKFILL ZONES FIGURE 3010.101 STANDARD ROAD PLAN SUDAS DIRECTOR DESIGN METHODS ENGINEER 1 1 OD/2 OD/2 OD/6 d TW OD D …
From iowadot.gov


PIPE TRENCH CALCULATOR
Web To access the pipe calculator, right click with your mouse and select Pipe Trench Calculator (or hold down the ALT key and press F8 on the keyboard). It is required that …
From tcli.com


13 PIPE AND STRUCTURE BACKFILL - INDIANA
Web PIPE AND STRUCTURE BACKFILL BACKFILL LIMITS The trench for the pipe is required to be backfilled as indicated on the plans or Standard Sheets with structural backfill or …
From in.gov


GRANULAR MATERIALS - ILLINOIS DEPARTMENT OF TRANSPORTATION
Web The fine aggregate gradations for granular embankment, granular backfill, bedding, and trench backfill for pipe culverts and storm sewers shall be FA 1, FA 2, or FA 6 through …
From idot.illinois.gov


AGGREGATE - ILLINOIS DEPARTMENT OF TRANSPORTATION
Web Aggregate. Various tests, including quality, freeze-thaw, and alkali-silica reactivity (ASR) are performed on aggregates used for road and bridge construction in Illinois. These tests …
From idot.illinois.gov


HIGHWAY STANDARDS & DISTRICT SPECIFIC STANDARDS
Web These drawings show the details of various construction items and are used in conjunction with the Standard Specifications. The applicable Standards are referenced on the cover …
From idot.illinois.gov


STATE OF ILLINOIS SPRINGFIELD POLICY MEMORANDUM
Web IDOT recognizes processed construction and demolition debris as a viable aggregate for trench backfill. 3.2 This policy memorandum establishes the requirements for both the …
From idot.illinois.gov


STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
Web specified. All backfill material shall be deposited in such a manner as not to damage the sewer. The filling of the trench shall be carried on simultaneously on both sides of the …
From spipipe.com


SECTION 2102 | REVISED 4/18/2023 - IOWA DEPARTMENT OF …
Web Construct a continuous trench having a minimum depth of 5 feet and a minimum width of 4 inches. Construct trenches outside the limits of the embankment. The Engineer will …
From iowadot.gov


SECTION 2552. TRENCH EXCAVATION AND BACKFILL 2552.01 …
Web A. Trench Excavation. 1. Notify the Engineer prior to the start of excavation activities. 2. Remove topsoil to a minimum depth of 12 inches (300 mm) and stockpile. 3. Excavate …
From iowadot.gov


IDOT - BUREAU OF MATERIALS PAGE 1 MISTIC …
Web 20800150 trench backfill cuyd p 016fa06 trench bfill & bed tons 1.50000 20800250 trench backfill spl cuyd p 052cm06 stone cr cldq tons 1.80000 20900110 porous gran backfill …
From idot.illinois.gov


X INDIANA DEPARTMENT OF TRANSPORTATION
Web 12 Pipe Opening C P A t c = W = 0.3B Bc or 0.75 ft, whichever is greater Wb = 2W + B Bc 12 2 2 c c H K W B = + + All methods, backfill quantity, B BBC, per linear foot from …
From in.gov


SECTION 2552 | REVISED 4/18/2023 - IOWA DEPARTMENT OF …
Web Backfill Material. Includes, but is not limited to: 1) Soils not classified as suitable backfill material, as defined in Article 2552.02, C. 2) Individual stones or concrete chunks larger …
From iowadot.gov


CA6 GRAVEL: ROAD BASE GRAVEL & RECYCLED CONCRETE | OZINGA
Web CA6 is commonly used for driveways, as a base stone for roads, building pads, and parking lots. It is also commonly used as a trench backfill. It’s associated with many stone and …
From ozinga.com


HOW TO CALCULATE THE AMOUNT OF FILL FOR A TRENCH | HUNKER
Web Apr 22, 2022 Calculate the volume of the trench by using this formula: Volume = Width x Length x Depth. As an example, a trench 12 feet long with an average width of 2.3 feet …
From hunker.com


IN.GOV | THE OFFICIAL WEBSITE OF THE STATE OF INDIANA
Web IN.gov | The Official Website of the State of Indiana
From in.gov


SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL …
Web Section 19 – Trench Excavation, Bedding and Backfill 19.3 12/1/03 left in the trench wall or embedment materials by support removal shall be carefully filled with bedding material …
From saccountyspecs.saccounty.gov


Related Search